| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 927 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
SM7-WAAS-APP Cisco WAAS software container for SM SRE 710 APP 11/08/2019 05/08/2020 05/31/2025
SM9-WAAS-APP Cisco WAAS software container for SM SRE 910 APP 11/08/2019 05/08/2020 05/31/2025
MEM-7541-24GB Cisco WAVE 7541 24GB memory (default) 11/08/2019 05/08/2020 05/31/2025
MEM-7571-48GB Cisco WAVE 7571 48GB memory (default) 11/08/2019 05/08/2020 05/31/2025
MEM-8541-96GB Cisco WAVE 8541 96GB memory (default) 11/08/2019 05/08/2020 05/31/2025
CVR-WAVE-DSK Cisco WAVE disk blank cover 11/08/2019 05/08/2020 05/31/2025
CVR-WAVE-IOM Cisco WAVE IOM blank cover 11/08/2019 05/08/2020 05/31/2025
SF-W2K8R2 Cisco Window 2008 R2 Server 11/08/2019 05/08/2020 05/31/2025
C1111-4PJ Cisco ISR 1100 4 Ports Dual GE WAN Ethernet Router Japan Config 11/07/2019 12/07/2019 03/07/2020
C1111-8PJ Cisco ISR 1100 8 Ports Dual GE WAN Ethernet Router Japan Config 11/07/2019 12/07/2019 03/07/2020
WS-CAC-3000W/2 Cisco ^Catalyst 6500 3000W second AC power supply 10/31/2019 10/30/2020 10/31/2025
WS-CAC-4000W-INT Cisco 4000W AC PowerSupply, International (cable included) 10/31/2019 10/30/2020 10/31/2025
WS-CAC-4000W-INT= Cisco 4000W AC PowerSupply, International (cable included) 10/31/2019 10/30/2020 10/31/2025
WS-CAC-4000W-US Cisco 4000Watt AC Power Supply for US (cable attached) 10/31/2019 10/30/2020 10/31/2025
WS-CAC-4000W-US= Cisco 4000Watt AC Power Supply for US (cable attached) 10/31/2019 10/30/2020 10/31/2025
MEM-SUP2T-4GB Cisco 4G DRAM Memory Total for Sup2T and Sup2TXL (2G + 2G) - UPGR 10/31/2019 10/30/2020 10/31/2025
VS-F6K-PFC4XL= Cisco Cat 6500 Policy Feature Card 4 XL S 10/31/2019 10/30/2020 10/31/2025
VS-S2T-10G Cisco Cat 6500 Sup 2T with 2 x 10GbE and 3 x 1GbE with MSFC5 PFC4 10/31/2019 10/30/2020 10/31/2025
VS-S2T-10G= Cisco Cat 6500 Sup 2T with 2 x 10GbE and 3 x 1GbE with MSFC5 PFC4 10/31/2019 10/30/2020 10/31/2025
VS-S2T-10G-XL Cisco Cat 6500 Sup 2T with 2x10GbE and 3 x 1GbE with MSFC5 PFC4XL 10/31/2019 10/30/2020 10/31/2025

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...