| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 854 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
HX-CPU-I8276M= Intel 8276M 2.2GHz/165W 28C/38.50MB 3DX DDR4 2T 2933 MHz 05/22/2020 08/21/2020 11/19/2020
UCS-CPU-I8276M Intel 8276M 2.2GHz/165W 28C/38.50MB DCP DDR4 2T 2933 MHz 05/22/2020 08/21/2020 11/19/2020
UCS-CPU-I8276M= Intel 8276M 2.2GHz/165W 28C/38.50MB DCP DDR4 2T 2933 MHz 05/22/2020 08/21/2020 11/19/2020
HX-CPU-I8280M Intel 8280M 2.7GHz/205W 28C/38.50MB 3DX DDR4 2TB 2933 MHz 05/22/2020 08/21/2020 11/19/2020
HX-CPU-I8280M= Intel 8280M 2.7GHz/205W 28C/38.50MB 3DX DDR4 2TB 2933 MHz 05/22/2020 08/21/2020 11/19/2020
UCS-CPU-I8280M Intel 8280M 2.7GHz/205W 28C/38.50MB DCP DDR4 2TB 2933 MHz 05/22/2020 08/21/2020 11/19/2020
UCS-CPU-I8280M= Intel 8280M 2.7GHz/205W 28C/38.50MB DCP DDR4 2TB 2933 MHz 05/22/2020 08/21/2020 11/19/2020
NV-NGC-S-5YR Nvidia NGC Support Services For C480 ML; 5 Year 05/22/2020 08/21/2020 11/19/2020
NV-NGC-S-5YR= Nvidia NGC Support Services For C480 ML; 5 Year 05/22/2020 08/21/2020 11/19/2020
UCS-S3260-EX32T S3260 HDD Expander with 4x 8TB UE10 7200RPM NL-SAS Drives 05/22/2020 08/21/2020 11/19/2020
UCS-ML-X64G4RSH++= TAA compliant 64GB DDR4-2666-MHz LRDIMM/PC4-21300/QR/x4/1.2v 05/22/2020 08/21/2020 11/19/2020
UCS-C3K-14HD10E UCS C3X60 1 row of 10TB 512e NL-SAS drives (14 Total) 140TB 05/22/2020 08/21/2020 11/19/2020
UCS-C3K-14HD10E= UCS C3X60 1 row of 10TB 512e NL-SAS drives (14 Total) 140TB 05/22/2020 08/21/2020 11/19/2020
UCS-C3K-28HD10E UCS C3X60 2row of 28x 10TB 512e NL-SAS drives (28Total)280TB 05/22/2020 08/21/2020 11/19/2020
UCS-C3K-42HD10E UCS C3X60 3 row of 42x 10TB 512e NL-SAS drives (42 Total) 42 05/22/2020 08/21/2020 11/19/2020
UCS-C3K-56HD10E UCS C3X60 4row of 56x 10TB 512e NL-SAS drives (56Total)560TB 05/22/2020 08/21/2020 11/19/2020
UCS-C3K-EX40TE UCS C3X60 Expander 4x 10TB 512e NL-SAS drives 40TB 05/22/2020 08/21/2020 11/19/2020
UCSB-EX-M4-3B UCS Scalable M4 Blade Module w/o v4 CPU/DIMM/HDD for B460 M4 05/22/2020 08/21/2020 11/19/2020
UCS-S3260-EX32T= VOID; Not Used 05/22/2020 08/21/2020 11/19/2020
UCS-C3K-EX40TE= VOID; Not Used 05/22/2020 08/21/2020 11/19/2020

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...