| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 557 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
UCS-240CBLMR12 Cisco C240 M4 (2) RAID controller cables for 12 HD backplane 06/17/2021 09/16/2021 09/16/2021
UCS-240CBLMR12= Cisco C240 M4 (2) RAID controller cables for 12 HD backplane 06/17/2021 09/16/2021 09/16/2021
UCS-240CBLMR16 Cisco C240 M4 (2) RAID controller cables for 16 HD backplane 06/17/2021 09/16/2021 09/16/2021
UCS-240CBLMR16= Cisco C240 M4 (2) RAID controller cables for 16 HD backplane 06/17/2021 09/16/2021 09/16/2021
UCSC-C480-M5ML8 Cisco Chassis w/8GPU, NoPSU, NoRAID/cable, NoHDDmod, NoCPUmod 06/17/2021 12/16/2021 12/31/2026
HX-C480-M5ML8 Cisco Compute Chassis w/8GPU, NoPSU,NoRAID/cable,NoHDDmod,NoCPUmod 06/17/2021 12/16/2021 12/31/2026
UCSC-FAN-C460-M4= Cisco Fan Module for UCS C460 M4 06/17/2021 09/16/2021 09/16/2021
UCSC-FAN-C460-M4 Cisco Fan Module for UCS C460 M4 06/17/2021 09/16/2021 09/16/2021
UCS-RAID9361CV-8I Cisco MegaRAID 9361CV with 8 internal SAS/SATA ports with Supercap 06/17/2021 09/16/2021 09/16/2021
UCS-RAID9361CV-8I= Cisco MegaRAID 9361CV with 8 internal SAS/SATA ports with Supercap 06/17/2021 09/16/2021 09/16/2021
UCSC-GPU-V100-32 Cisco NVIDIA TESLA, VOLTA 100 PCIE 32GB, 250W 06/17/2021 09/16/2021 09/16/2021
UCSC-GPU-V100-32= Cisco NVIDIA TESLA, VOLTA 100 PCIE 32GB, 250W 06/17/2021 09/16/2021 09/16/2021
HX-GPU-V100-32 Cisco NVIDIA TESLA, VOLTA 100 PCIE 32GB, 250W 06/17/2021 09/16/2021 09/16/2021
HX-GPU-V100-32= Cisco NVIDIA TESLA, VOLTA 100 PCIE 32GB, 250W 06/17/2021 09/16/2021 09/16/2021
UCSC-GPUV100SXM32 Cisco NVIDIA TESLA, VOLTA SXM2 16GB, 300W 06/17/2021 09/16/2021 09/16/2021
UCSC-GPUV100SXM32= Cisco NVIDIA TESLA, VOLTA SXM2 32GB, 300W 06/17/2021 09/16/2021 09/16/2021
UCSC-BZL-EX-M5ML Cisco Optional Bezel for UCS C480 M5ML rack server 06/17/2021 09/16/2021 09/16/2021
UCSC-BZL-EX-M5ML= Cisco Optional Bezel for UCS C480 M5ML rack server 06/17/2021 09/16/2021 09/16/2021
UCSC-C480-M5ML= Cisco Service Only: Chassis w/o GPU, PSU, CPU, Mem, HDD, PCIe, PSU 06/17/2021 12/16/2021 12/31/2026
UCS-480ML-G-GAP= Cisco Service Only: Gap Pad Kit for a GPU on C480 ML M5 06/17/2021 09/16/2021 09/16/2021

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...