| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 1907 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
R210-BUN-4 Cisco <<NO NEW ORD<DISTI CLEAR ONLY<<C210, 1xE5620, 1x4GB, 1PS 08/03/2012 11/02/2012 11/30/2017
UCSC-DBUN-C210-105 Cisco <<NO NEW ORD<DISTI CLEAR ONLY<<C210,1xE5606,1x4GB,1PS 08/03/2012 11/02/2012 11/30/2017
UCSC-DBUN-C210-103 Cisco <<NO NEW ORD<DISTI CLEAR ONLY<<C210,1xE5649,1x4GB,1PS 08/03/2012 11/02/2012 11/30/2017
UCSC-DBUN-C210-117 Cisco <<NO NEW ORD<DISTI CLEAR ONLY<<C210,1xE5649,1x8GB,1PS 08/03/2012 11/02/2012 11/30/2017
UCSC-DBUN-C210-104 Cisco <<NO NEW ORD<DISTI CLEAR ONLY<<C210,2xE5649,2x4GB,SASexp,1PS 08/03/2012 11/02/2012 11/30/2017
UCSC-DBUN-C210-118 Cisco <<NO NEW ORD<DISTI CLEAR ONLY<<C210,2xE5649,2x8GB,SASexp,1PS 08/03/2012 11/02/2012 11/30/2017
R210-BUN-1 Cisco <<NO NEW ORD<DISTI CLEAR ONLY<<C210,2xX5650, 2x4GB, SASexp, 1PS 08/03/2012 11/02/2012 11/30/2017
UCSC-DBUN-C210-119 Cisco <<NO NEW ORD<DISTI CLEAR ONLY<<C210,2xX5675,2x8GB,SASexp,1PS 08/03/2012 11/02/2012 11/30/2017
R200-10PK-BUN Cisco 10-Pk C200 LFF, 2X5650, 6x8GB, 2x1TB, 1064E, 2PSU, Rail, DLOM 08/03/2012 11/02/2012 11/30/2017
R2X0-PSU2-650W-SB Cisco 650W power supply, w/added 5A Standby for UCS C200 or C210 08/03/2012 11/02/2012 11/30/2017
R2X0-PSU2-650W-SB= Cisco 650W power supply, w/added 5A Standby for UCS C200 or C210 08/03/2012 11/02/2012 11/30/2017
UCSC-BSE-SFF-C200 Cisco C200 M2 SFF Rack Srvr w/ 1PSU w/o CPU, mem, HDD, PCIe, DVD 08/03/2012 11/02/2012 11/30/2017
UCSC-C200M2-SFF Cisco C200 M2 SFF Rack Srvr w/ dual-6-core,1GbE, 300GB DAS 08/03/2012 11/02/2012 11/30/2017
R2XX-CMAG3-1032= Cisco Cable Mgmt Arm for G3 10-32 rail kit for C200/C210 08/03/2012 11/02/2012 11/30/2017
R2XX-CMAG3-1032 Cisco Cable Mgmt Arm for R2XX-G31032RAIL for C200/C210 08/03/2012 11/02/2012 11/30/2017
UCSC-CON-SFF-C200 Cisco Controller panel for UCS C200 SFF Rack Server 08/03/2012 11/02/2012 11/30/2017
UCSC-CON-SFF-C200= Cisco Controller panel for UCS C200 SFF Rack Server 08/03/2012 11/02/2012 11/30/2017
UCSC-BSFF-C200-CH Cisco DISTIonly C200 M2 SFF Rack Srvr w/o CPU, mem, HDD, PCIe, DVD 08/03/2012 11/02/2012 11/30/2017
UCSC-BSFF-C200D-CH Cisco DISTIonly C200 M2 SFF Srvr w/ DVD, w/o CPU, mem, HDD, PCIe 08/03/2012 11/02/2012 11/30/2017
R200-1120402W-CH Cisco DISTIonly: UCS C200 M2 Srvr for Dist w/ 1 PS 08/03/2012 11/02/2012 11/30/2017

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...