| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 1900 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
N5K-C5010-BUN Cisco Nexus 5010 Chassis, 2RU, 20 Fixed 10GE/FCoE Ports 10/30/2012 04/30/2013 04/30/2018
N5K-C5020-BUN Cisco Nexus 5020 Chassis, 2RU, 40 Fixed 10GE/FCoE Ports 10/30/2012 04/30/2013 04/30/2018
UCS-SP3-C200-WAAS1 Cisco UCS C200 Server for R200-vWAAS-750, to host vWAAS 750 SW 10/24/2012 01/23/2013 01/31/2018
UCS-SP3-C210-WAAS3 Cisco UCS C210 Server for R210-vWAAS-12K, to host vWAAS 12K SW 10/24/2012 01/23/2013 01/31/2018
UCS-SP3-C210-WAAS2 Cisco UCS C210 Server for R210-vWAAS-6K, to host vWAAS 6K SW 10/24/2012 01/23/2013 01/31/2018
DS-X9248-48HVK9= Cisco 4/44-Port Host Optimized 8-Gbps FC Module, 48 4G SW SFPs 10/19/2012 07/31/2013 07/31/2018
DS-X9248-48HPK9= Cisco 4/44-Port Host Optimized 8G FC Module for HP with Service, S 10/19/2012 07/31/2013 07/31/2018
DS-X9248-48K9 Cisco 4/44-Port Host-Optimized 8-Gbps FC Module 10/19/2012 07/31/2013 07/31/2018
DS-X9248-48K9= Cisco 4/44-Port Host-Optimized 8-Gbps FC Module, Spare 10/19/2012 07/31/2013 07/31/2018
DS-X9248-96K9 Cisco 48-Port 8-Gbps Fibre Channel Switching Module 10/19/2012 07/31/2013 07/31/2018
DS-X9248-96HVK9= Cisco 48-Port 8-Gbps Fibre Channel Switching Module, 48 4G SW SFPs 10/19/2012 07/31/2013 07/31/2018
DS-X9248-96H8K9= Cisco 48-Port 8-Gbps Fibre Channel Switching Module, 48 8G SW SFPs 10/19/2012 07/31/2013 07/31/2018
DS-X9248-96K9= Cisco 48-Port 8-Gbps Fibre Channel Switching Module, Spare 10/19/2012 07/31/2013 07/31/2018
DS-X9248-96HPK9= Cisco 48-port Performance 8Gb FC Module for HP with Service, Spare 10/19/2012 07/31/2013 07/31/2018
DS-C9513-3AK9 Cisco MDS 9513 Base Config: Chassis, 2 Sup-2A,2 Fabric2,2 6K AC PS 10/19/2012 04/19/2013 04/30/2018
DS-13SLT-FAB2 Cisco MDS 9513 Crossbar Switching Fabric Module 2 10/19/2012 04/19/2013 04/30/2018
DS-13SLT-FAB2= Cisco MDS 9513 Crossbar Switching Fabric Module 2 10/19/2012 04/19/2013 04/30/2018
DS-13SLT-FAB2HP= Cisco MDS 9513 Crossbar Switching Fabric Module 2 for HP, Promo 10/19/2012 04/19/2013 04/30/2018
DS-13SLT-FAB2P= Cisco MDS 9513 Crossbar Switching Fabric Module 2, Promo Spare 10/19/2012 04/19/2013 04/30/2018
DS-C9513-3ANHK9 Cisco MDS 9513: Chassis, 2x(Sup2A, FAB2, 6K PS) for HP 10/19/2012 04/19/2013 04/30/2018

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...