| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 19 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
HCI-NVB1T9O1VM6= Cisco 1.9TB 2.5in U.2 15mm Solidigm P5520 Hg Perf Med End 1X NVMe 06/30/2025 09/29/2025 12/28/2025
HCI-NVMEI4I1920M6 Cisco 1.9TB 2.5in U.2 Intel P5500 NVMe High Perf Medium Endurance 06/30/2025 09/29/2025 12/28/2025
HCI-NVMEI4I1920M6= Cisco 1.9TB 2.5in U.2 Intel P5500 NVMe High Perf Medium Endurance 06/30/2025 09/29/2025 12/28/2025
EXP-10GSFP-SR-MP Cisco 10 Gigabit Ethernet SFP Module 10GBASE-SR SFP+ SR Optics 06/30/2025 09/29/2025 09/30/2030
EXP-10GSFP-SR-MP= Cisco 10 Gigabit Ethernet SFP Module 10GBASE-SR SFP+ SR Optics 06/30/2025 09/29/2025 09/30/2030
EUR-PCCE-125-SW Cisco 12.5 PCCE Software 06/30/2025 12/31/2025 12/31/2027
EUR-UCCE-125-SW Cisco 12.5 UCCE Software 06/30/2025 12/31/2025 12/31/2027
EUR-PCCE-126-SW Cisco 12.6 PCCE Software 06/30/2025 12/31/2025 12/31/2027
EUR-UCCE-126-SW Cisco 12.6 UCCE Software 06/30/2025 12/31/2025 12/31/2027
BE7K-PSU-M6-1200 Cisco 1200W Titanium power supply for C-Series Servers 06/30/2025 09/29/2025 09/30/2030
EXP-PSU1-1200W Cisco 1200W Titanium power supply for C-Series Servers 06/30/2025 09/29/2025 09/30/2030
EXP-RAID-220M6 Cisco 12G SAS RAID Controller w/4GB FBWC (16 Drv) w/1U Brkt 06/30/2025 09/29/2025 09/30/2030
BE6K-RAIDCTRLR-M6 Cisco 12G SAS RAID Controller w/4GB FBWC (16 Drv) w/1U Brkt 06/30/2025 09/29/2025 09/30/2030
HCI-SD15TKA1XEVM6 Cisco 15.3TB 2.5in Enter Value 12G SAS Kioxia G2 SSD 06/30/2025 09/29/2025 12/28/2025
HCI-SD15TKA1XEVM6= Cisco 15.3TB 2.5in Enter Value 12G SAS Kioxia G2 SSD 06/30/2025 09/29/2025 12/28/2025
HCI-NVB15TO1VM6 Cisco 15.3TB 2.5in U.2 15mm Solidigm P5520 Hg Perf Med End 1X NVMe 06/30/2025 09/29/2025 12/28/2025
HCI-NVB15TO1VM6= Cisco 15.3TB 2.5in U.2 15mm Solidigm P5520 Hg Perf Med End 1X NVMe 06/30/2025 09/29/2025 12/28/2025
BE7K-RAM-M6-M5 Cisco 16GB RDIMM SRx4 3200 (8Gb) 06/30/2025 09/29/2025 09/30/2030
EXP-MR-X16G1RW Cisco 16GB RDIMM SRx4 3200 (8Gb) 06/30/2025 09/29/2025 09/30/2030
HCI-M2240OA1VM6 Cisco 240GB M.2 Boot Solidigm S4520 SATA 1X SSD 06/30/2025 09/29/2025 12/28/2025

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...