| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 1884 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
DV-5.2-K9-CPW Cisco Show-n-Share NFRV5.2 Perptl SW Lic. - For CUWP Only 06/10/2013 12/09/2013 12/31/2018
N20-FW006 Cisco UCS 5108 Blade Server Chassis FW package 06/06/2013 12/05/2013 12/31/2018
N10-MGT006 Cisco UCS Manager v1.4 06/06/2013 12/05/2013 12/31/2018
UCS-SSD100GI1F104= Cisco 100GB SATA SSD hot plug/drive sled mounted 06/01/2013 06/01/2014 05/31/2019
UCS-SSD100GI1F104 Cisco 100GB SATA SSD hot plug/drive sled mounted 06/01/2013 08/31/2013 08/31/2018
UCS-HDD300GI2F208 Cisco 300GB SAS 15K RPM 3.5 inch HDD/hot plug/drive sled mounted 06/01/2013 11/30/2013 11/30/2018
UCS-HDD300GI2F208= Cisco 300GB SAS 15K RPM 3.5 inch HDD/hot plug/drive sled mounted 06/01/2013 11/30/2013 11/30/2018
UCS-HDD450GI2F209 Cisco 450GB SAS 15K RPM 3.5 inch HDD/hot plug/drive sled mounted 06/01/2013 11/30/2013 11/30/2018
UCS-HDD450GI2F209= Cisco 450GB SAS 15K RPM 3.5 inch HDD/hot plug/drive sled mounted 06/01/2013 11/30/2013 11/30/2018
UCS-HDD600GI2F210 Cisco 600GB SAS 15K RPM 3.5 inch HDD/hot plug/drive sled mounted 06/01/2013 11/30/2013 11/30/2018
UCS-HDD600GI2F210= Cisco 600GB SAS 15K RPM 3.5 inch HDD/hot plug/drive sled mounted 06/01/2013 11/30/2013 11/30/2018
A02-MEMKIT-004C-L Cisco Bundle component for A02-M308GB2-2-L 06/01/2013 08/31/2013 08/31/2018
UCSC-PCIE-RL-C240= Cisco Left PCIe Riser Board (Riser 1) for C240 M3 06/01/2013 08/31/2013 08/31/2018
UCSV-RAID-9265CV= Cisco MegaRAID 9265CV-8i, 1GB TMM, Supercap for C22/C24 06/01/2013 11/30/2013 11/30/2018
UCS-RAID-9266= Cisco MegaRAID 9266-8i + battery backup for C240 and C220 [spare] 06/01/2013 06/01/2014 05/31/2019
UCS-RAID-9266CV= Cisco MegaRAID 9266CV-8i w/TFM + Super Cap 06/01/2013 06/01/2014 05/31/2019
UCS-RAID-9266CV Cisco MegaRAID 9266CV-8i w/TFM + Super Cap 06/01/2013 11/30/2013 11/30/2018
UCS-RAID-9285CV-E= Cisco MegaRAID 9285CV-8e, 2 x4 SAS external connector, w/ Supercap 06/01/2013 06/01/2014 05/31/2019
UCS-RAID-9285CV-E Cisco MegaRAID 9285CV-8e, 2 x4 SAS external connector, w/ Supercap 06/01/2013 11/30/2013 11/30/2018
UCSC-PCIE-RR-C240= Cisco Right PCIe Riser Board (Riser 2) for C240 M3 (services spare 06/01/2013 08/31/2013 08/31/2018

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...