| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 1850 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
SF-ASA5505-7.2-K8 Cisco ASA 5500 Series Software v7.2 for ASA 5505 01/02/2014 07/03/2014 07/31/2019
IAD888EB-K9 Cisco IAD888 EFM Based BRI Security Router w/ ISDN Backup 01/02/2014 07/03/2014 07/31/2019
IAD888EF-K9 Cisco IAD888 EFM Security Router w/ FXS and ISDN Backup 01/02/2014 07/03/2014 07/31/2019
IAD888BW-GN-E-K9 Cisco IAD888 G.SHDSL BRI Sec ISDN B/U 802.11n ETSI Comp 01/02/2014 07/03/2014 07/31/2019
IAD888BW-GN-A-K9 Cisco IAD888 G.SHDSL BRI Sec ISDN B/U 802.11n FCC Comp 01/02/2014 07/03/2014 07/31/2019
IAD888B-K9 Cisco IAD888 G.SHDSL BRI Sec Router w/ ISDN B/U 01/02/2014 07/03/2014 07/31/2019
IAD888FW-GN-E-K9 Cisco IAD888 G.SHDSL FXS Sec ISDN B/U 802.11n ETSI Comp 01/02/2014 07/03/2014 07/31/2019
IAD888FW-GN-A-K9 Cisco IAD888 G.SHDSL FXS Sec ISDN B/U 802.11n FCC Comp 01/02/2014 07/03/2014 07/31/2019
IAD888F-K9 Cisco IAD888 G.SHDSL/FXS/Sec Router w/ ISDN B/U 01/02/2014 07/03/2014 07/31/2019
CISCO892-DRAM-K9 Cisco Router Bundle - C892, WAASX Feature License, Max Mem 01/02/2014 07/03/2014 07/31/2019
15454E-SFP-L.16.1= Cisco ONS 15454 SONET/SDH SFP Short Haul Transceiver Module 12/20/2013 12/20/2014 12/31/2019
A01-X0108 Cisco 1.86GHz Xeon L5609 40W CPU/12M cache/4C 12/18/2013 06/18/2014 06/30/2019
A01-X0108= Cisco 1.86GHz Xeon L5609 40W CPU/12M/4C/NoHeatSink 12/18/2013 12/18/2014 12/31/2019
A01-X0107 Cisco 2.13GHz Xeon L5630 40W CPU/12M cache/4C 12/18/2013 06/18/2014 06/30/2019
A01-X0107= Cisco 2.13GHz Xeon L5630 40W CPU/12M/4C/NoHeatSink 12/18/2013 12/18/2014 12/31/2019
A01-X0106= Cisco 2.26GHz Xeon L5640 60W CPU/12M/DDR3 1333MHz/NoHeatSink 12/18/2013 12/18/2014 12/31/2019
A01-X0106 Cisco 2.26GHz Xeon L5640 60W CPU/12MB cache/DDR3 1333MHz 12/18/2013 06/18/2014 06/30/2019
UCS-CPU-E5645 Cisco 2.40 GHz E5645/80W 6C/12M Cache/DDR3 1333MHz 12/18/2013 06/18/2014 06/30/2019
UCS-CPU-E5645= Cisco 2.40 GHz E5645/80W 6C/12M Cache/DDR3 1333MHz/NoHeatSink 12/18/2013 12/18/2014 12/31/2019
A01-X0111 Cisco 2.40GHz Xeon E5620 80W CPU/12MB cache/DDR3 1066MHz 12/18/2013 06/18/2014 06/30/2019

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...