| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 1742 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
UCS-SP7-B200P-24T Cisco SP7 B200 PERF 2x6248, 1xCH, 4xB200w/2x2680v2, 256G+Invicta24T A 10/22/2014 11/22/2014 02/22/2015
UCS-SP7-B200P-24TS Cisco SP7 B200 PERF 2x6248, 1xCH, 4xB200w/2x2680v2, 256G+Invicta24T S 10/22/2014 11/22/2014 02/22/2015
M9222ISSE1K9 Cisco Storage Services Enabler for MDS 9222i base switch 10/22/2014 04/22/2015 04/30/2020
L-M9222ISSE1K9= Cisco Storage Services Enabler on MDS 9222i 10/22/2014 04/22/2015 04/30/2020
M9222ISSE1K9= Cisco Storage Services Enabler on MDS 9222i 10/22/2014 04/22/2015 04/30/2020
M9222ISSE1HK9= Cisco Storage Services Enabler on MDS 9222i, HP Spare 10/22/2014 04/22/2015 04/30/2020
UCS-SP7-C220-V Cisco UCS C220 VALUE SGLC 2x2232, 4xC220w/2xE5-2640v2, 64G, VIC1225 10/22/2014 11/22/2014 02/22/2015
UCS-SP7-C220-VP Cisco UCS C220 VPLUS SGLC 2x2232, 4xC220w/2xE5-2643v2, 64G, VIC1225 10/22/2014 11/22/2014 02/22/2015
UCS-SP7-C240-P Cisco UCS C240 PERF SGLC 2x2232, 4xC240w/2xE5-2680v2, 128G, VIC1225 10/22/2014 11/22/2014 02/22/2015
UCS-SP7-C240-V Cisco UCS C240 VALUE SGLC 2x2232, 4xC220w/2xE5-2640v2, 64G, VIC1225 10/22/2014 11/22/2014 02/22/2015
UCSC-EPOD-C220E-S Cisco UCS EZ EXPRESS POD BDL /w2x3048, 2xC220, 4x600GB 10/22/2014 11/22/2014 02/22/2015
UCSC-EPOD-C220E-M Cisco UCS EZ EXPRESS POD BDL /w2x3048, 4xC220, 8x600GB 10/22/2014 11/22/2014 02/22/2015
UCSC-FPOD-C220V Cisco UCS EZ FLEXPOD BDL /w2x5548, 2x6248, 2x2232, 4xC220 10/22/2014 11/22/2014 02/22/2015
UCSB-FPOD-B200S-UD Cisco UCS FLEXPOD DC S w/UCS DIR, 2xN5K, 2x6248, 1xCH, 4xB200 10/22/2014 11/22/2014 02/22/2015
UCSB-FPOD-B200S-VM Cisco UCS FLEXPOD DC S w/UCS DIR, VMW, 2xN5K, 2x6248, 1xCH, 4xB200 10/22/2014 11/22/2014 02/22/2015
UCSC-FPEX-C220E-M Cisco UCS FLEXPOD EXPRESS M w/UCS DIR, 2x3048, 4xC220-2xE5-2650, 64G 10/22/2014 11/22/2014 02/22/2015
UCSC-FPEX-C220E-S Cisco UCS FLEXPOD EXPRESS S w/UCS DIR, 2x3048, 2xC220-2xE5-2650, 64G 10/22/2014 11/22/2014 02/22/2015
UCSB-FPOD-B200M Cisco UCS SP FLEXPOD MED SOLUTION PAK 2xFI, 2N5K, 2xCH, 8xB200 10/22/2014 11/22/2014 02/22/2015
UCSB-FPOD-B200S Cisco UCS SP FLEXPOD SMALL SOLUTION PAK 2xFI, 2N5K, 1xCH, 4xB200 10/22/2014 11/22/2014 02/22/2015
UCSC-EZ7-FIO-1205M Cisco UCS SP7 1205GB MLC Fusion ioDrive2 PCIE 10/22/2014 11/22/2014 02/22/2015

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...