| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 1723 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
WS-C2960S-48LPS-L Cisco Catalyst 2960S 48 GigE PoE 370W, 4 x SFP LAN Base 11/06/2014 11/06/2015 11/30/2020
WS-C2960S-48FPD-L Cisco Catalyst 2960S 48 GigE PoE 740W, 2 x 10G SFP+ LAN Base 11/06/2014 11/06/2015 11/30/2020
WS-C2960S-48FPS-L Cisco Catalyst 2960S 48 GigE PoE 740W, 4 x SFP LAN Base 11/06/2014 11/06/2015 11/30/2020
WS-C2960S-48TD-L Cisco Catalyst 2960S 48 GigE, 2 x 10G SFP+ LAN Base 11/06/2014 11/06/2015 11/30/2020
WS-C2960S-48TS-S Cisco Catalyst 2960S 48 GigE, 2 x SFP LAN Lite 11/06/2014 11/06/2015 11/30/2020
WS-C2960S-48TS-L Cisco Catalyst 2960S 48 GigE, 4 x SFP LAN Base 11/06/2014 11/06/2015 11/30/2020
C2960S-STACK= Cisco Catalyst 2960S Flexstack Stack Module 11/06/2014 11/06/2015 11/30/2020
C2960S-F-STACK Cisco Catalyst 2960S Flexstack Stack Module (FE) 11/06/2014 11/06/2015 11/30/2020
C2960S-F-STACK= Cisco Catalyst 2960S Flexstack Stack Module (FE) 11/06/2014 11/06/2015 11/30/2020
C2960S-STACK Cisco Catalyst 2960S FlexStack Stack Module optional for LAN Base 11/06/2014 11/06/2015 11/30/2020
PRIME-NCS-APL-K9 Cisco Prime Network Control System Hardware Appliance 11/05/2014 05/06/2015 05/31/2020
UCSC-RC-P8M-C260 Cisco .79m SAS RAID Cable for C260 10/31/2014 05/01/2015 04/30/2020
UCSC-RC-1M-C260 Cisco 1.04m SAS RAID Cable for C260 10/31/2014 05/01/2015 04/30/2020
UCS-CPU-E5603= Cisco 1.60 GHz E5603/80W 4C/8MB Cache/DDR3 800MHz - spare 10/31/2014 01/30/2015 01/31/2020
UCS-CPU-L5609= Cisco 1.86 GHz L5609/40W 4C/12MB Cache/DDR3 1066MHz - spare 10/31/2014 01/30/2015 01/31/2020
C260-MRBD-002 Cisco 2 DIMM Memory Riser Board For C260 10/31/2014 05/01/2015 04/30/2020
UCS-CPU-E5606= Cisco 2.13 GHz E5606/80W 4C/4MB Cache/DDR3 800MHz - spare 10/31/2014 01/30/2015 01/31/2020
UCS-CPU-E5607= Cisco 2.26 GHz E5607/80W 4C/8MB Cache/DDR3 1066MHz - spare 10/31/2014 01/30/2015 01/31/2020
UCS-HD300G10K12G= Cisco 300GB 12G SAS 10K RPM SFF HDD/hot-plug/drive sled mounted 10/31/2014 01/30/2015 01/31/2020
C260-MRBD-004 Cisco 4 DIMM Memory Riser Board For C260 10/31/2014 05/01/2015 04/30/2020

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...