| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 1698 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
UCS-SPR-C220-P1 Cisco UCS C220 M3 SFF 2xE5-2660v2, 2x16GB, 9271CV, 2x650W, SD, RAILS 02/27/2015 08/29/2015 12/31/2021
UCS-SPR-C220-P2 Cisco UCS C220 M3 SFF 2xE5-2680v2, 2x16GB, 9271CV, 2x650W, SD, RAILS 02/27/2015 08/29/2015 12/31/2021
UCS-SPR-C240-E1 Cisco UCS C240 M3 SFF 2xE5-2609v2, 2x8GB, RAID-11, 2x650W, SD, RAILS 02/27/2015 08/29/2015 12/31/2021
UCS-SPR-C240-E2 Cisco UCS C240 M3 SFF 2xE5-2620v2, 2x8GB, RAID-11, 2x650W, SD, RAILS 02/27/2015 08/29/2015 12/31/2021
UCS-SPR-C240-V1 Cisco UCS C240 M3 SFF 2xE5-2640v2, 2x8GB, 9271CVRAID, 2x650W, SD, RAILS 02/27/2015 08/29/2015 12/31/2021
UCS-SPR-C240-V2 Cisco UCS C240 M3 SFF 2xE5-2650v2, 2x8GB, 9271CVRAID, 2x650W, SD, RAILS 02/27/2015 08/29/2015 12/31/2021
UCS-SPR-C240-P1 Cisco UCS C240 M3 SFF 2xE5-2660v2, 2x16GB, 9271CV, 2x650W, SD, RAILS 02/27/2015 08/29/2015 12/31/2021
UCS-SPR-C240-P2 Cisco UCS C240 M3 SFF 2xE5-2680v2, 2x16GB, 9271CV, 2x650W, SD, RAILS 02/27/2015 08/29/2015 12/31/2021
UCS-C260M2-VCD2 Cisco UCS C260 M2 Rack Server w/ 2-E72870, 16x 2x4GB DDR 02/27/2015 05/29/2015 05/31/2020
UCS-CPU-E72803 Cisco 1.73 GHz E7-2803 105W 6C / 18M Cache 02/20/2015 05/22/2015 05/31/2020
UCS-CPU-E74807 Cisco 1.86 GHz E7-4807 95W 6c CPU / 18m Cache 02/20/2015 05/22/2015 05/31/2020
UCS-CPU-E72820 Cisco 2 GHz E7-2820 105W 8C / 18M Cache 02/20/2015 05/22/2015 05/31/2020
UCS-CPU-E72850 Cisco 2 GHz E7-2850 130W 10C /24M Cache 02/20/2015 05/22/2015 05/31/2020
UCS-CPU-E74850 Cisco 2 GHz E7-4850 130W 10C CPU / 24M Cache 02/20/2015 05/22/2015 05/31/2020
UCS-CPU-E72830 Cisco 2.13 GHz E7-2830 105W 8C / 24M Cache 02/20/2015 05/22/2015 05/31/2020
UCS-CPU-E74830 Cisco 2.13 GHz E7-4830 105W 8C CPU / 24M Cache 02/20/2015 05/22/2015 05/31/2020
UCS-CPU-E78867L Cisco 2.13 GHz E7-8867L 105W 10C / 30M Cache 02/20/2015 05/22/2015 05/31/2020
UCS-CPU-E72860 Cisco 2.26 GHz E7-2860 130W 10C / 24M Cache 02/20/2015 05/22/2015 05/31/2020
UCS-CPU-E74860 Cisco 2.26 GHZ E7-4860 130W 10C CPU / 24M Cache 02/20/2015 05/22/2015 05/31/2020
UCS-CPU-E72870 Cisco 2.4 GHz E7-2870 130W 10C / 30M Cache 02/20/2015 05/22/2015 05/31/2020

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...