| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 1489 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
UCS-MR-1X162RY-A Cisco 16GB DDR3-1600-MHz RDIMM/PC3-12800/dual rank/1.35v 07/02/2016 12/31/2016 12/31/2021
UCSB-FBWC-1GB Cisco 1GB flash backed write cache for LSI 2208R 07/02/2016 12/31/2016 12/31/2021
UCSB-RAID-1GBFM= Cisco 1GB flash module for LSI 2208R 07/02/2016 12/31/2016 12/31/2021
UCSC-RAID-MZ-240 Cisco 2008 Mezz Card for UCS C240 server, HW TSOC For RAID 0/1/10 07/02/2016 12/31/2016 12/31/2021
UCSC-RAID-MZ-240= Cisco 2008 Mezz Card for UCS C240 server, HW TSOC For RAID 0/1/10 07/02/2016 12/31/2016 12/31/2021
UCSC-HDBP-C240-24 Cisco 24 Drive HDD Backplane for C240 M3 (services spare only) 07/02/2016 12/31/2016 12/31/2021
UCSC-RAIL-2U Cisco 2U Rail Kit for UCS C-Series servers 07/02/2016 12/31/2016 12/31/2021
UCS-MR-2X082RY-B Cisco 2x8 GB DDR3-1600-MHz RDIMM/PC3-12800/2R/x4/1.35V 07/02/2016 12/31/2016 12/31/2021
UCS-MR-2X082RY-B= Cisco 2x8 GB DDR3-1600-MHz RDIMM/PC3-12800/2R/x4/1.35V 07/02/2016 12/31/2016 12/31/2021
UCS-ML-1X324RY-A Cisco 32GB DDR3-1600-MHz LR DIMM/PC3-12800/quad rank/x4/1.35v 07/02/2016 12/31/2016 12/31/2021
UCSC-PSU-450W Cisco 450W power supply for C-series rack servers 07/02/2016 12/31/2016 12/31/2021
UCSC-PSU-650W Cisco 650W power supply for C-series rack servers 07/02/2016 12/31/2016 12/31/2021
UCSC-GPUCBL-88S Cisco 8 TO 8 PIN STRAIGHT GPU PWR CABLE K1-K2 C240 NEW MB 07/02/2016 12/31/2016 12/31/2021
UCSC-GPUCBL-88Y Cisco 8 TO 8 PIN Y GPU PWR CABLE DUAL K1-K2 C240 NEW MB 07/02/2016 12/31/2016 12/31/2021
UCS-MR-1X082RY-A Cisco 8GB DDR3-1600-MHz RDIMM/PC3-12800/dual rank/1.35v 07/02/2016 12/31/2016 12/31/2021
UCSB-BAFF-B420-M3= Cisco Air Baffle Replacement Kit for B420 M3 Server (services spar 07/02/2016 12/31/2016 12/31/2021
UCSC-RAIL-2UB Cisco Ball Bearing Rail Kit for C240 rack servers 07/02/2016 12/31/2016 12/31/2021
UCSC-PCIE-BTG Cisco Broadcom 57712 Dual Port 10GBASE-T w/TOE iSCSI 07/02/2016 12/31/2016 12/31/2021
UCSC-PCIE-B3SFP Cisco BROADCOM 57810 10Gb A-FEX SFP+ 07/02/2016 12/31/2016 12/31/2021
UCSC-C240M3L-TS2 Cisco C240 M3L, 2xE5-2660v2, 12x16GB, 12x3TB 07/02/2016 12/31/2016 12/31/2021

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...