| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 139 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
HCIAF220C-M6SN-FRE Cisco CCHC R2L Free HCIAF220cM6 All Flash NVMe Node 08/05/2024 09/05/2024 12/05/2024
HCIAF240C-M6SX-FRE Cisco CCHC R2L Free HCIAF240cM6 All Flash Node 08/05/2024 09/05/2024 12/05/2024
HCI-R2L-M6-OFFER Cisco CCHC with Nutanix Refuse to Lose M6 HX Migration Offer 08/05/2024 09/05/2024 12/05/2024
UCSC-C125-CH Cisco DISTI: UCS C125 Base Compute Node Tray 08/05/2024 02/03/2025 02/28/2030
UCSC-C4200-SFF-CH Cisco DISTI: UCS C4200 Chassis 24 SFF HDD/SSD SAS/SATA 08/05/2024 02/03/2025 02/28/2030
PLHC-N20-FAN5 Cisco Fan module for UCS 5108 08/05/2024 11/04/2024 11/04/2024
UCS-MAH-B02R00 Cisco MSFT Azure Stack Bundle for adding a server node 08/05/2024 09/05/2024 12/05/2024
UCSX-9508-NEW Cisco Not sold standalone UCS 9508 Chassis w/o nodes 08/05/2024 09/05/2024 12/05/2024
UCS-FI-6454-NEW Cisco Not sold standalone UCS Fabric Interconnect 6454 08/05/2024 09/05/2024 12/05/2024
CBL-SC-MR12GM52 Cisco Super Cap cable for UCSC-RAID-M5 on C240 M5 Servers 08/05/2024 11/04/2024 11/04/2024
CBL-SC-MR12GM52= Cisco Super Cap cable for UCSC-RAID-M5 on C240 M5 Servers 08/05/2024 11/04/2024 11/04/2024
UCS-C4200-MLB Cisco UCS 4200 MLB 08/05/2024 02/03/2025 02/28/2030
UCSB-5108-HVDC Cisco UCS 5108 Blade Chassis 200V-380V HVDC 0 PSU/8 fans/0 FEX 08/05/2024 02/03/2025 02/28/2030
UCSB-5108-HVDC-UPG Cisco UCS 5108 Blade Chassis 200V-380V HVDC 0 PSU/8 fans/0 FEX 08/05/2024 02/03/2025 02/28/2030
UCSB-5108-HVDC= Cisco UCS 5108 Blade Chassis 200V-380V HVDC 0 PSU/8 fans/0 FEX 08/05/2024 02/03/2025 02/28/2030
UCSB-5108-DC2 Cisco UCS 5108 Blade Server DC2 Chassis/0 PSU/8 fans/0 FEX 08/05/2024 02/03/2025 02/28/2030
UCSB-5108-DC2-UPG Cisco UCS 5108 Blade Server DC2 Chassis/0 PSU/8 fans/0 FEX 08/05/2024 02/03/2025 02/28/2030
UCSB-5108-DC2= Cisco UCS 5108 Blade Server DC2 Chassis/0 PSU/8 fans/0 FEX 08/05/2024 02/03/2025 02/28/2030
UCSB-5108-DC2++= Cisco UCS 5108 Blade Server DC2 Chassis/0 PSU/8 fans/0 FEX 08/05/2024 02/03/2025 02/28/2030
UCSX-9508-M6-FREE Cisco UCS 9508 Free Chassis 08/05/2024 09/05/2024 12/05/2024

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...