| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 1191 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
CISCO1941-IB/K9 Cisco 1941 w/ IP Business,2 GE,2 EHWIC slots,512MB DRAM 03/31/2018 09/29/2018 09/30/2023
CISCO1941/K9 Cisco 1941 w/2 GE,2 EHWIC slots,256MB CF,512MB DRAM,IP Base 03/31/2018 09/29/2018 09/30/2023
CISCO1941/K9++ Cisco 1941 w/2 GE,2 EHWIC slots,256MB CF,512MB DRAM,IP Base 03/31/2018 09/29/2018 09/30/2023
CISCO1941-2.5G/K9 Cisco 1941 with 2.5G DRAM, 256MB Flash 03/31/2018 09/29/2018 09/30/2023
15454-M-CFP-LC Cisco 2 x 100G CFP Line Card 03/31/2018 03/31/2019 03/31/2024
15454-M-CFP-LC= Cisco 2 x 100G CFP Line Card 03/31/2018 03/31/2019 03/31/2024
CIT2-CPU-E52680D Cisco 2.50 GHz E5-2680 v3/120W 12C/30MB Cache/DDR4 2133MHz 03/31/2018 06/30/2018 06/30/2023
CIT2-CPU-E52660D Cisco 2.60 GHz E5-2660 v3/105W 10C/25MB Cache/DDR4 2133MHz 03/31/2018 06/30/2018 06/30/2023
15454W-2X100G-SK Cisco 2x 100G LR4 LH Transponder - Starter Kit 03/31/2018 03/31/2019 03/31/2024
CIT2-HD300G10K12G Cisco 300GB 12G SAS 10K RPM SFF HDD 03/31/2018 06/30/2018 06/30/2023
CIT2-HD300G15K12G Cisco 300GB 12G SAS 15K RPM SFF HDD 03/31/2018 06/30/2018 06/30/2023
CIT2-A03-D300GA2 Cisco 300GB 6Gb SAS 10K RPM SFF HDD/hot plug/drive sled mounted 03/31/2018 06/30/2018 06/30/2023
CIT2-HDD300GI2F105 Cisco 300GB 6Gb SAS 15K RPM SFF HDD/Hot Plug/Drive Sled Mounted 03/31/2018 06/30/2018 06/30/2023
BE7H-M4-K9 Cisco Business Edition 7000H Svr (M4), Export Restrict. SW 03/31/2018 06/30/2018 06/30/2023
BE7H-M4-XU Cisco Business Edition 7000H Svr (M4), Export Unrestrict SW 03/31/2018 06/30/2018 06/30/2023
BE7M-M4-K9 Cisco Business Edition 7000M Svr (M4), Export Restricted SW 03/31/2018 06/30/2018 06/30/2023
BE7M-M4-XU Cisco Business Edition 7000M Svr (M4), Export Unrestrict. SW 03/31/2018 06/30/2018 06/30/2023
CISCO1921DC/K9 Cisco C1921 Modular Router DC Power,2GE,2EHWICslots,512MB, IP Base 03/31/2018 09/29/2018 09/30/2023
CISCO1921/K9 Cisco C1921 Modular Router, 2 GE, 2 EHWIC slots, 512DRAM, IP Base 03/31/2018 09/29/2018 09/30/2023
CISCO1941-HSEC/K9 Cisco HSEC bundle (no ISM VPN module) for 1941 ISR platform 03/31/2018 09/29/2018 09/30/2023

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...