| EOL & EOSL Checker
Go to Router-Switch.com

CISCO End-of-Life Product List

Total Products: 39072 | Page 1040 of 1954

Part Number Product Name EOL Announcement End of Sale (EOS) End of Service Life (EOSL)
UCS-220CBLSR4= Cisco C220 M4 SATA/SW RAID cable (1) for 4 HDD backplane chassis 02/14/2019 02/14/2020 02/28/2025
UCSC-BZL-C220M4= Cisco C220 M4 Security Bezel 02/14/2019 02/14/2020 02/28/2025
UCS-220CBLSR8= Cisco C220 M4 set of 2 SATA/SW RAID cables for 8HDD bckpln chassis 02/14/2019 02/14/2020 02/28/2025
UCSC-IPSSD-240M4B= Cisco C240 M4 PCIE SSD Interposer bd + cable (24 drive config) 02/14/2019 02/14/2020 02/28/2025
UCSC-IP-SSD-240M4= Cisco C240 M4 PCIE SSD Interposer bd + cable (8-16 drive config) 02/14/2019 02/14/2020 02/28/2025
UCSC-BZL-C240M4= Cisco C240 M4 Security Bezel 02/14/2019 02/14/2020 02/28/2025
UCSC-CMA-4U= Cisco Cable Management Arm for UCS C460 M4 02/14/2019 02/14/2020 02/28/2025
UCSB-HS-EP-M4-F= Cisco CPU Heat Sink for UCS B200 M4/B420 M4 (Front) 02/14/2019 02/14/2020 02/28/2025
UCSB-HS-EP-M4-R= Cisco CPU Heat Sink for UCS B200 M4/B420 M4 (Rear) 02/14/2019 02/14/2020 02/28/2025
UCSC-HS-01-EX= Cisco CPU Heat Sink for UCS C460 M4 Rack Server 02/14/2019 02/14/2020 02/28/2025
UCSB-HS-EX-L= Cisco CPU Heatsink for UCS B260 M4 & B460 M4 Socket 1 (Left) 02/14/2019 02/14/2020 02/28/2025
UCSB-HS-EX-R= Cisco CPU Heatsink for UCS B260 M4 & B460 M4 Socket 2 (Right) 02/14/2019 02/14/2020 02/28/2025
N2XX-AEPCI05= Cisco Emulex LPe 12002, 8Gb dual port Fibre Channel HBA 02/14/2019 02/14/2020 02/28/2025
UCSC-PCIE-E16002= Cisco Emulex LPe16002 Dual-Port 16Gb Fibre Channel HBA w/SR Optics 02/14/2019 02/14/2020 02/28/2025
UCSC-PCIE-E14102= Cisco Emulex OCe14102-UX dual-port 10 GbE FCoE CNA 02/14/2019 02/14/2020 02/28/2025
UCSC-PCIE-E14102B= Cisco Emulex OCe14102B-UX dual-port 10G SFP+ with iSCSI, FCoE CNA 02/14/2019 02/14/2020 02/28/2025
UCSC-PCIE-FLR-F= Cisco Full Height PCIe slot filler for C Series 02/14/2019 02/14/2020 02/28/2025
UCSC-HS-C220M4= Cisco Heat sink for UCS C220 M4 rack servers 02/14/2019 02/14/2020 02/28/2025
UCSC-HS-C240M4= Cisco Heat sink for UCS C240 M4 rack servers 02/14/2019 02/14/2020 02/28/2025
UCSC-PCIE-ITG= Cisco Intel X540 Dual Port 10GBase-T Adapter 02/14/2019 02/14/2020 02/28/2025

CISCO Product Series EOL List

  • Switches

  • Routers

  • Firewalls

  • Servers

  • Wireless

  • Data Storage

  • Optical Transmission Network

  • Networking Accessories

  • Optical Access Network

  • Unified Communications

  • Video Surveillance

  • Software

  • Others

Cisco End-of-Life Policy Overview

Router-Switch.com provides this summary based on the official End of Life (EOL) policy published by Cisco. The goal is to help users clearly understand how Cisco defines lifecycle milestones, support timelines, and the transition process as products move toward EOL and End of Service Life (EOSL).

Key Lifecycle Milestones

The EOL process is marked by several key milestones. Understanding these milestones is crucial for effective network planning and management. The table below provides a summary of these milestones and their definitions.

Milestone Definition
End-of-Life Announcement Date The date on which Cisco officially announces the end-of-sale and end-of-life of a product to the public.
End-of-Sale Date (EOS) The last date to order the product through Cisco. After this date, the product is no longer available for purchase.
Last Ship Date The last possible date that a product can be shipped from Cisco or its manufacturers. This is typically three months after the EOS date for hardware.
End of Software Maintenance Releases Date The last date that Cisco Engineering will release any final software maintenance releases or bug fixes. After this, no new software development, repair, or testing will be done.
End of Vulnerability/Security Support The last date that Cisco will release bug fixes for security vulnerabilities. After this date, any security fixes may only be available in later supported software releases.
End of New Service Attachment Date The last date to purchase a new service and support contract for equipment that is not already covered by one.
End of Service Contract Renewal Date The last date to extend or renew an existing service contract for the product. The contract cannot be renewed beyond the Last Date of Support.
Last Date of Support (LDOS) The final date to receive service and support for the product under an active service contract. After this date, all support services are unavailable, and the product is considered obsolete.

Support Timeline After End-of-Sale (EOS)

Cisco provides different levels of support for hardware, operating system (OS) software, and application software after the End-of-Sale (EOS) date. The following table summarizes the typical support timeline for customers with an active service contract.

Support Category Support Activity Duration from End-of-Sale (EOS) Date
Hardware (with Service) Cisco TAC Support 5 years
Add or Attach New Service Contracts Up to 1 year
Renew Service Contracts Up to 5 years (not to exceed LDOS)
Last Date of Support 5 years
OS Software Cisco TAC Support 3 years
Software Maintenance Releases 1 year (bug fixes for critical issues)
Last Date of Support 3 years
Application Software (with Service) Cisco TAC Support 2 years
Software Maintenance Releases 1 year
Last Date of Support 2 years
Software Subscriptions Subscription Term As per the term of the subscription
Renew/Modify Subscriptions As defined in the external announcement

Please note that Cisco's official EOL policy may be updated or changed over time. For the most accurate and up-to-date information, please visit the official Cisco EOL Policy.

Loading...